๐Ÿ“ฅ Free downloads

Free construction templates in Excel: DPR, BOQ, MB, RA bill, muster roll

Five templates every site and billing office uses, each with working formulas, a filled example and a how-to sheet. Free for contractors, engineers, students and colleges to use and share.

By the True Site Sync team ยท Last updated 11 November 2026

๐Ÿ“ฆ Download the full pack

All five templates in one zip file.

Download all 5 (.zip)

No email or sign-up. Colleges, associations and trainers are welcome to share the pack with credit to True Site Sync.

The templates

๐Ÿ“„

Daily Progress Report (DPR) format

Manpower, work done with % complete, material, machinery, hindrances and weather.

Download .xlsx (11 KB) ยท Guide โ†’

๐Ÿ“„

BOQ format

Item, description, unit, quantity, rate, amount; summary with GST. Imports into the app.

Download .xlsx (11 KB) ยท Guide โ†’

๐Ÿ“„

Measurement book (MB) format

Nos ร— L ร— B ร— D with deductions, and an abstract that totals each item.

Download .xlsx (13 KB) ยท Guide โ†’

๐Ÿ“„

RA bill format

Up-to-date, previous and this-bill quantities; GST, retention, TDS, GST TDS, cess and net payable.

Download .xlsx (11 KB) ยท Guide โ†’

๐Ÿ“„

Labour attendance sheet / muster roll

31-day P/A/H attendance, days present, wages, overtime, advances and net payable.

Download .xlsx (14 KB) ยท Guide โ†’

Skip the spreadsheet. Each template is one screen in True Site Sync: the DPR, measurement book, RA bill and muster roll fill themselves from site entries, offline, and share as PDFs on WhatsApp. Start a free 6-day trial โ†’

How the templates connect

BOQ

The contract items and rates.

DPR

What was done each day, with labour and material.

Measurement book

Measured quantities per BOQ item.

RA bill

Up-to-date minus previous quantities, times rate, less deductions.

Muster roll

Attendance and wages for the labour behind the work.

Frequently asked questions

Are these construction templates free?

Yes. All five are free to download, use, copy and share. No email or sign-up is needed.

Do the templates work in Google Sheets?

Yes. They are standard .xlsx files and open in Excel, Google Sheets and WPS Office with the formulas working.

Can colleges and trainers share these templates?

Yes. Colleges, associations and trainers may share them with students and members, with credit to True Site Sync.

Which template should I start with?

Start with the BOQ, because the measurement book and RA bill use the same item numbers. Site teams usually start with the DPR and muster roll.

Stop re-typing the same numbers into five sheets

In True Site Sync, one site entry feeds the DPR, MB, RA bill and wages.

Start free 6-day trial

Or book a demo.