📍 Site Operations

Site management software that runs the site from where the work happens

Measurement, progress, materials, labour and daily reports — captured on site, on a phone, offline — so the office sees the real picture the moment it happens, not a week later.

✓ Offline on site✓ Built for Indian sitesFrom ₹2,400/yr

The gap between the site and the office is where money is lost

The site knows the truth: what was poured today, how much steel came in, which machine broke down, how many masons turned up. The office needs that truth to bill, to buy, and to decide. But between them sits a gap filled with delay — a diary that reaches the office at month-end, a WhatsApp update that scrolls away, a phone call half-remembered. By the time the office acts, the site has moved on.

Site management software closes that gap. Instead of the site writing things down to be typed up later, the site records directly into the system — measurement, progress, material, labour, equipment — from a phone, even with no signal. The office isn't waiting for a report; it's watching the site live. Decisions that used to wait for month-end happen the same day.

The core idea: the site records once, on the spot, and the office sees it instantly — no re-typing, no lag, no lost updates.

See it in action

Here's a site's daily picture in True Site Sync — progress, material, labour and equipment together.

True Site Sync — Site Today · Riverside Tower
Work logged
8 items
Labour present
42
Material in
2 GRNs
Machines
5 working
ActivityMeasuredLabourMaterial usedStatus
Slab RCC — 4th floor92 m³18 masonsCement, steelDone
Blockwork — 2nd floor410 m²12 masonsBlocks, mortarOngoing
Plaster — 1st floor—8 masonsSand, cementOngoing

Illustrative site day — measurement, labour and material captured together, on site.

▶
Product walkthrough (demo video coming soon)

How the site runs on the app

Capture work as it happens

Record measurements and progress against BOQ items directly on site, offline if needed.

Log material, labour & plant

Note material received and issued, labour present, and machine hours — in seconds, from the field.

Report the day

The daily site report builds itself from what was logged — no separate write-up.

Office sees it live

Everything syncs to the office and owner the moment there's signal, so decisions don't wait.

Everything a site needs, in the field

📐

Measurement

Record L×B×H or direct quantities against BOQ items, offline.

📈

Progress

Track activity-wise progress against plan, with photos.

📦

Material

GRN, issues and stock at the site store.

👷

Labour

Attendance and gang deployment by activity.

🚜

Equipment

Machine hours, fuel and breakdowns on site.

📝

Daily reports

DPRs built from what was logged, shared instantly.

Who uses it

Site engineer

One app, no paperwork

Records measurement, material and labour from the field and never writes a separate report — the DPR builds itself.

Project manager

Multiple sites, live

Watches progress, material and labour across sites from the office without a single phone call.

Owner

Real status on a phone

Sees what actually happened on each site today, instead of a rosy update at month-end.

Site software vs. diary + WhatsApp

TaskDiary / WhatsAppTrue Site Sync
Office sees site statusDays laterLive
Daily reportWritten twiceAuto-built
Measurement to billRe-typedFlows through
Updates get lostOftenNever
Photos with contextScatteredOn the activity
Works offline—Yes

The site is the start of everything

What's captured on site flows straight into RA billing, inventory, cash flow and the daily progress report. Site management is one part of the full project management platform — see the site management guide for India for the complete approach, and the mobile-first app for site engineers.

Site management software — FAQs

What is site management software?

It is software that lets a construction site be run from the field — capturing measurement, progress, materials, labour, equipment and daily reports on a phone, offline if needed — so the office and owner see the real site picture live instead of at month-end.

Does the site team need internet to use it?

No. It is offline-first, so engineers record work, material and labour with no signal, and everything syncs to the office and cloud the moment they reconnect.

Does it replace the daily site report?

It automates it. The daily progress report builds itself from what was logged during the day, so engineers do not write the report twice.

Can the office see multiple sites at once?

Yes. Progress, material and labour across all your sites are visible from one screen in the office, without phone calls or waiting for updates.

Does site data flow into billing and cash flow?

Yes. Measurements captured on site flow into RA billing and GST invoices, and material and payments flow into cash flow, so there is no re-entry between the site and the accounts.

How much does it cost?

True Site Sync starts at ₹2,400/year for the Solo plan with a free 6-day trial of the full platform.

★ ★ Site and office, in sync
“

My engineers used to spend evenings writing up the day, and half of it never reached me anyway. Now they log it on the phone as they go, and I see every site live from the office. The lag between site and office is basically gone.

PT
Prakash Tiwari
Project Head
★★★★★

Run your sites from the field

Start free — close the gap between site and office.

Start free 6-day trial