🏗️ Project Management

Construction project management software that runs on one connected platform

Measurement, billing, materials, equipment, cash flow and site progress — connected, not scattered across ten spreadsheets — so you run every project from a single source of truth.

✓ Offline on site✓ Built for Indian sitesFrom ₹2,400/yr

Most "project management" is really ten disconnected files

Ask a mid-sized Indian contractor how they manage projects and the honest answer is: a measurement register on site, a billing sheet in the office, a material book with the storekeeper, a diesel log in a machine cabin, a cash position in the owner's head, and a WhatsApp group tying it all loosely together. Each is maintained by a different person, in a different format, updated at a different time. None of them agree.

That's not project management — it's ten islands you row between. The measurement doesn't match the bill, the bill doesn't match the cash forecast, the material issued doesn't match the work done, and by the time the numbers are reconciled the project is over. Real project management software replaces the islands with one connected system, where measuring work on site updates the bill, the cash forecast and the cost — all at once.

The core idea: enter each fact once, where it happens, and let it flow everywhere it's needed — no re-typing, no reconciliation.

See it in action

Here's a project overview in True Site Sync — billing, cost, cash and progress from one screen.

True Site Sync — Project · Riverside Tower
Billed to date
₹42.8L
Received
₹31.2L
Outstanding
₹11.6L
Progress
62%
Work orderValueBilledReceivedProgress
RCC structure₹1.20 Cr₹78.0L₹60.0L65%
Blockwork & plaster₹42.0L₹18.4L₹12.0L44%
Finishing₹58.0L₹0₹00%

Illustrative project dashboard — billing, receipts and progress per work order, live.

▶
Product walkthrough (demo video coming soon)

How a project runs on True Site Sync

Set up the project & BOQ

Add the project, its work orders and BOQ items with rates, GST and retention — the backbone everything hangs off.

Measure work on site

Site engineers record measurements against BOQ items on their phones, offline, as work is done.

Bill, buy and track

Measurements become RA bills; indents become POs and GRNs; machines and materials are logged — all against the project.

See the whole project live

Billing, receipts, cost, cash flow and progress roll up automatically, so the owner sees real status any time.

One platform, every discipline

📐

Measurement

Digital measurement sheets and abstracts, offline on site.

🧾

Billing

RA bills, GST invoices and client ledgers from the measurements.

📦

Materials

Indent, PO, GRN, stock and consumption per site.

🚜

Equipment

Plant and machinery hours, fuel and maintenance.

💰

Cash flow

Receivables, payables and forecast, always current.

📈

Progress

Site progress and reporting tied to the work measured.

Who uses it

Civil contractor

Multiple projects at once

Runs three sites from one login, seeing which is profitable and which is bleeding, without waiting for a manual monthly report.

Builder / developer

Owner's single view

Checks billing, cash and progress across the portfolio from a phone, instead of chasing six people for six spreadsheets.

Project engineer

One system on site

Measures, indents and reports from one app in the field, so the office always has live data.

One platform vs. ten spreadsheets

TaskSpreadsheetsTrue Site Sync
Site to bill to cashManual re-entryAutomatic flow
Live project statusMonth-endAny time
Data agrees across teamsRarelyOne source
Owner visibilityChase peopleOn a phone
Multiple projectsFile per siteOne login
Works offline on site—Yes

Built around how Indian contractors actually work

True Site Sync isn't a generic PM tool with construction bolted on — it's built around the Indian contractor's real workflow: measurement sheets → RA bills → GST billing → cash flow, with materials and equipment alongside. It handles CGST/SGST/IGST, retention, RA billing and BOQ item rates natively, and works offline for sites with poor connectivity. For the full picture, see the construction ERP and the site management guide.

Construction project management — FAQs

What is construction project management software?

It is software that runs a construction project from one connected platform — measurement, billing, materials, equipment, cash flow and progress — so that entering a fact once (like measuring work on site) updates everything downstream, instead of maintaining ten separate spreadsheets.

Is it built for Indian contractors?

Yes. True Site Sync handles RA (Running Account) billing, BOQ item rates, retention, and CGST/SGST/IGST natively, and works offline for sites with poor connectivity — it is built around how Indian contractors actually work, not a generic global tool.

Can it manage multiple projects at once?

Yes. You run all your projects from one login and see billing, cash and progress per project and across the portfolio, so you know which sites are profitable at any time.

Does the site team need internet?

No. It is offline-first — site engineers measure, indent and report with no signal, and the data syncs to the office and cloud when they reconnect.

How is it different from Excel or WhatsApp?

Excel and WhatsApp leave your data scattered and disconnected, so measurement, billing and cash never agree. True Site Sync keeps one source of truth where each fact flows automatically to the bill, the cost and the cash forecast.

How much does it cost?

True Site Sync starts at ₹2,400/year for the Solo plan and includes a free 6-day trial of the full platform.

★ ★ One source of truth
“

I used to spend the first week of every month just reconciling spreadsheets to find out where each project stood. Now it's on one screen, live. I run three sites with less effort than one site used to take, and I actually know which ones are making money.

DK
Dinesh Kulkarni
Managing Director
★★★★★

Run every project from one screen

Start free — connect your whole operation today.

Start free 6-day trial