📍 Hyderabad

Construction management software for Hyderabad's builders

From the Financial District and Gachibowli IT corridor to sprawling residential townships, Hyderabad builds big. True Site Sync keeps large-scale measurement, RA billing, materials and cash flow connected and live, offline on site.

✓ Offline on site✓ Built for Indian contractorsFrom ₹2,400/yr

Big projects magnify small record-keeping gaps

Hyderabad's construction is defined by scale — vast IT-corridor commercial builds around Gachibowli and the Financial District, and residential townships stretching toward Kokapet, Tellapur and beyond. At this scale, small record-keeping gaps become large money problems: a rate mismatch across a huge BOQ, a retention error repeated over dozens of RA bills, or material leakage on a site consuming truckloads a day. What a small project forgives, a large one punishes.

True Site Sync is built to keep large projects reconciled. Measurement flows into RA bills where previous quantities and retention are handled automatically no matter how long the BOQ, material is controlled at truckload scale, and cash flow stays live across the portfolio — so growth in project size doesn't outrun your control of it.

Built for how Hyderabad builds

Large IT-corridor and township work means long BOQs, many work orders and heavy material flow, so automatic RA billing and reconciled material management matter most. True Site Sync's analytics-friendly, live project view suits Hyderabad's data-comfortable developers, and offline-first capture handles township-edge sites. Every billed figure traces to a measurement — essential when a single error repeats across a large contract.

How True Site Sync works

Set up projects & BOQ

Add each project, work order and BOQ item with rates, GST and retention.

Measure on site, offline

Site engineers record measurements and material on the phone, with or without signal.

Bill, buy and track

Measurements become RA bills; indents become GRNs; machines and stock are logged against the project.

See everything live

Billing, cash flow, materials and progress roll up automatically for the office and owner.

One platform for the whole operation

📐

Measurement

Digital measurement sheets and books, offline on site.

🔁

RA & GST billing

Running-account bills with retention and CGST/SGST/IGST.

📦

Materials

Indent, GRN, stock and supplier reconciliation.

🚜

Equipment

Plant hours, fuel and maintenance across sites.

💰

Cash flow

Billed, received and outstanding, always current.

📈

Progress & reports

Site progress and daily reports built from field logs.

How Hyderabad contractors use it

IT-corridor contractor

Large commercial BOQs

Bills against huge commercial BOQs with retention and GST applied consistently across many work orders, keeping the running account reconciled.

Township developer

Truckload-scale material

Controls high-volume cement, steel and aggregate with indent-to-GRN reconciliation, catching leakage that scale would otherwise hide.

Multi-project builder

Portfolio cash view

Sees billed, received and outstanding across Financial District and township projects from one live screen.

True Site Sync vs. spreadsheets & WhatsApp

TaskExcel / WhatsAppTrue Site Sync
Measurement to billRe-typedAutomatic
Live project statusMonth-endAny time
RA billing, GST, retentionManualBuilt in
Materials & equipmentSeparate booksOne system
Works offline on siteNoYes
Owner visibilityChase peopleOn a phone

Everything connected, from site to payment

At scale, connected control is protection. True Site Sync links RA billing, materials, cash flow and equipment. See the project management platform and billing & compliance guide.

Construction software in Hyderabad — FAQs

Is True Site Sync suitable for large Hyderabad projects?

Yes. It keeps large projects reconciled — automatic RA billing across long BOQs and many work orders, retention applied consistently, and material controlled at truckload scale — so the small gaps that big projects punish are prevented.

Does it handle high-volume material on township sites?

Yes. Material management reconciles indent, PO, GRN and supplier bill even at truckload volumes, catching leakage and short-supply that scale would otherwise hide.

Can owners see all their Hyderabad projects at once?

Yes. Billed, received and outstanding across IT-corridor and township projects roll up into one live view, drillable back to site measurements.

Does True Site Sync work offline on site?

Yes. It is offline-first, so site teams in and around Hyderabad can record measurements, material and progress with no signal, and everything syncs when they reconnect.

Is it built for Indian contractors?

Yes. It handles RA (Running Account) billing, BOQ item rates, retention and CGST/SGST/IGST natively — built around how Indian contractors actually work, not a generic global tool.

How much does it cost?

True Site Sync starts at ₹2,400/year for the Solo plan and includes a free 6-day trial of the full platform.

★ ★ Control that scales
“

On a township this size, one retention mistake repeated across forty RA bills is real money. Automating the billing so previous quantities and retention are always right removed that risk entirely — and I can see cash across all our projects live. At our scale, that control is everything.

VR
Venkat Rao
Township Developer, Hyderabad
★★★★★

Run your Hyderabad sites from one screen

Start free — no card required. Built for Indian contractors.

Start free 6-day trial