The short answer
Powerplay is a well-known Indian construction site-management app — its public feature list centers on daily logs, site photos, task assignment, labour attendance and material movement, aimed at keeping a large site team coordinated. True Site Sync focuses specifically on turning site measurements into BOQ-linked RA bills — the part of the job that eats the most time for a billing engineer or a small contractor doing their own accounts. The two solve different halves of running a site, and the entry pricing reflects the different audience: Powerplay's published plans start around ₹70,000+/year; True Site Sync starts at ₹2,400/year.
What Powerplay is built for
Based on its public product pages, Powerplay's strengths are daily progress logs, photo documentation, task tracking across office and site teams, labour attendance, and material request/movement tracking — useful for a large site team that needs everyone coordinated day to day. It's a mature, widely used app in the Indian market with a large install base.
What True Site Sync is built for
True Site Sync starts where the measurement book usually lives: record Nos × L × B × H against BOQ items, generate the priced abstract, and raise the RA bill with previous/current/balance quantity, retention and GST applied automatically — plus inventory tied to the same BOQ consumption, labour wages, and a cash-flow view of what each site is actually earning. It's the billing-and-accounts side of the job, done digitally instead of in a measurement book and Excel.
True Site Sync vs Powerplay — at a glance
| Capability | True Site Sync | Powerplay |
|---|---|---|
| Digital measurement sheets (L×B×H) | Yes — core focus | Not the core focus |
| BOQ-linked quantity tracking | Yes — core focus | Not the core focus |
| RA bills (prev / current / balance + retention) | Yes — core focus | Not the core focus |
| Daily progress logs & site photos | Basic | Yes — core focus |
| Labour attendance & wages | Yes | Yes |
| Material request & movement tracking | Yes, tied to BOQ | Yes |
| GST-ready invoices | Yes | Not the core focus |
| Cash-flow view per project | Yes | Not the core focus |
| Entry pricing | ₹2,400/year (solo) | ~₹70,000+/year |
| Best fit | Small–mid contractors, billing-first | Larger site teams, operations-first |
Powerplay feature and pricing information is based on their public marketing pages at time of writing and may have changed — verify current details at getpowerplay.in.
Pricing — built for a different size of business
| Plan | Price | Users |
|---|---|---|
| Solo | ₹2,400 / year | Up to 1 |
| Starter | ₹5,100 / year | Up to 5 |
| Business | ₹12,000 / year | Up to 12 |
| Pro | ₹24,000 / year | Up to 25 |
| Enterprise | ₹50,000 / year | Up to 50 |
Even True Site Sync's top Enterprise tier (₹50,000/year, up to 50 users) is priced below Powerplay's publicly listed starting price — because True Site Sync is built to be affordable for the small and mid-size contractors who are priced out of larger enterprise site-management tools, not just large teams.
See it in action
| BOQ item | Unit | Rate | This bill amount |
|---|---|---|---|
| RCC M25 | m³ | ₹7,200 | ₹2,48,400 |
Illustrative — an RA bill computed automatically from measured quantity, with retention and GST applied.
Who should pick which
You run a large, multi-site team
Coordinating dozens of field staff with daily logs, photos and task tracking is the main pain point, and budget for an enterprise site-ops tool exists.
Billing is the bottleneck
Measurement books, manual RA bill calculation and Excel are slowing you down, and you want it solved without an enterprise price tag.
You need operations and billing
Some contractors run a site-ops app for field coordination and True Site Sync specifically for measurement-to-bill.
True Site Sync vs Powerplay — frequently asked questions
What is the difference between True Site Sync and Powerplay?
Powerplay centers on daily site logs, photos and task/labour tracking. True Site Sync centers on measurement-to-RA-bill billing with BOQ and retention.
Is Powerplay expensive compared to True Site Sync?
Powerplay's public pricing starts around ₹70,000+/year; True Site Sync starts at ₹2,400/year, scaling to ₹50,000/year for up to 50 users.
Does Powerplay do RA billing?
Its public feature list centers on progress/labour/material tracking, not BOQ-driven RA billing — which is True Site Sync's focus.
Can I use both?
Yes — some teams run a site-ops app for field coordination alongside True Site Sync for billing.
Which is better for a small contractor?
For a solo engineer or small team whose bottleneck is manual RA billing, True Site Sync's lower price and billing-first design usually fit better.
As a two-person site office we didn't need an enterprise-priced app with fifty features we'd never touch. We needed measurement sheets and RA bills done properly. That's exactly what we got, at a price that made sense for our size.
Billing-first, priced for small and mid-size contractors
Measurement, BOQ, RA billing, inventory and cash flow — from ₹2,400/year. Start free.
Start free 6-day trial