⚖️ Onsite / Teams Alternative

An Onsite alternative that goes beyond tracking to real billing

Onsite is good at attendance and expense tracking. True Site Sync does that too — and then measures work, raises RA bills with GST, and manages materials, equipment and cash flow, so you run the whole business, not just the diary.

✓ Built for Indian contractors✓ Offline on siteFrom ₹2,400/yr

Tracking is a start — but billing is where contractors get paid

Apps like Onsite have done a real service: they got contractors off paper for attendance, expenses and basic site tracking. But most contractors quickly hit the same ceiling — the app records what was spent and who was present, but it can't measure the work, price it against a BOQ, raise a Running Account bill with retention and GST, or tell them whether the project is profitable. So they still run their actual billing in Excel, and the two never meet.

True Site Sync is the comprehensive step up. It covers the tracking basics, but its core is the contractor's money chain: measurement book → abstract → RA bill → GST invoice → cash flow, with materials and equipment alongside. Instead of tracking activity and billing separately, you do both in one platform where the work you record turns directly into the bill you send.

The honest take: if all you'll ever need is attendance and expense tracking, a lightweight tracker is fine. If you bill on BOQ and RA and want profit visibility, you'll outgrow it fast.

True Site Sync vs. Onsite (Teams)

CapabilityOnsite / trackersTrue Site Sync
Attendance & expensesYesYes
Measurement book / abstractNoYes
RA billing + retentionNoYes
GST tax invoicesBasic / noFull
Materials & equipmentLimitedFull
Project profitNoYes

From tracking to the full picture

True Site Sync links what you track to what you bill and what you earn.

True Site Sync — Beyond tracking
Tracked
Labour · spend
Measured
Work done
Billed
RA + GST
Profit
Per project
StageTrackerTrue Site Sync
Record workNotes onlyMeasurement book
Bill the workExcelRA bill + GST
Know profitNoPer project

Illustrative — tracking, billing and profit in one connected flow.

▶
Product walkthrough (demo video coming soon)

Moving up from a tracker

Start free

Open a workspace and add your project and BOQ.

Keep tracking

Attendance, expenses and site notes carry on as before.

Add real billing

Measure work, raise RA bills with retention and GST from those measurements.

See profit

Billing minus cost gives you project-wise profit you never had before.

What you gain over a tracker

📖

Measurement

Record and value work, not just log activity.

🔁

RA billing

Running-account bills with retention.

🇮🇳

GST invoices

CGST/SGST/IGST and SAC done right.

📦

Materials

Indent, GRN, stock and suppliers.

🚜

Equipment

Plant hours, fuel, maintenance.

📊

Profit

Know which projects actually make money.

One platform instead of tracker plus Excel

The real win is ending the split between your tracking app and your Excel billing. In True Site Sync, measurement, RA billing, materials and cash flow are one system. Explore the full contractor management platform, or compare the Excel alternative and Powerplay comparison.

Onsite alternative — FAQs

Is True Site Sync an alternative to Onsite (Teams)?

Yes, and a more comprehensive one. It covers the tracking basics like attendance and expenses, but adds the contractor's core money chain — measurement, RA billing, GST, materials, equipment and cash flow — that lightweight trackers don't handle.

Does it do attendance and expense tracking too?

Yes. You can track labour attendance and site expenses, so you are not losing what a tracker gives you — you are adding measurement, billing and profit on top.

What can it do that Onsite can't?

Record and value measured work against a BOQ, raise Running Account bills with retention, produce GST-compliant tax invoices, manage material and equipment, and show project-wise profit — the areas where trackers stop and contractors fall back to Excel.

Is it harder to use than a simple tracker?

No. It is built for site teams, works offline, and you can start with a free trial and one project. You adopt the extra capabilities as you need them.

Does it work offline on site?

Yes. True Site Sync is offline-first, so field capture works with no signal and syncs when you reconnect.

How much does it cost?

True Site Sync starts at ₹2,400/year for the Solo plan with a free 6-day trial of the full platform.

★ ★ Beyond tracking
“

We used a tracker for attendance and expenses, but our billing was still stuck in Excel and the two never talked. True Site Sync does the tracking and the RA billing and the GST — and for the first time I can see profit per project. It replaced two tools with one.

RN
Rahul Nair
Contractor
★★★★★

Track, bill and profit — in one place

Start free — go beyond a tracker today.

Start free 6-day trial