👷 Hajiri & wages

Labour Attendance App for Construction Sites: hajiri, muster roll and wages

If your wage bill comes from a muster roll filled in at the end of the day, you're paying for the register, not the site. Labour attendance software for construction sites records who actually worked, on the day, and carries it straight into wages, advances and project cost.

✓ Full day, half day, OT✓ Kharchi & deductions✓ Works with no signal

By the True Site Sync team · Last updated 13 October 2026

What does labour attendance software do on a construction site?

Labour attendance software lets supervisors mark hajiri (attendance) for workers and gangs on a phone at the site, even with no network. Each day records present, half day and overtime. Wages, kharchi (advances) and deductions are calculated from it, and labour cost lands on the right project automatically.

It replaces three registers that rarely agree: the muster roll, the wage sheet and the cost report.

Where paper muster rolls leak money

How True Site Sync handles site attendance and wages

Register each worker once

Name, skill, Aadhaar, optional PAN, emergency contact and native place. Set them as daily-wage or piece-rate, and link them to their contractor or gang leader (mukadam), or mark them as direct.

Mark hajiri on site

Mark each worker present, half day or absent, with overtime hours. It saves on the phone with no signal and syncs later. See the offline app.

Record kharchi and deductions as they happen

Log mid-week cash advances, and deductions for lost tools, damaged PPE or penalties, against the worker.

Pay the week in one go

Bulk Pay pays selected daily-wage workers and deducts each one's pending advance automatically. Piece-rate workers are settled on measured work instead. The monthly muster shows everything.

Staff punch in and out with GPS and a photo

Salaried and supervisory staff punch in and out with their location and a photo. Hours beyond the standard day become overtime, if overtime is enabled for that person.

Worked example: one helper's weekly payout

LineWorkingAmount
Daily rateHelper, daily-wage₹700
Attendance this week5 full days + 1 half day = 5.5 days5.5 × ₹700 = ₹3,850
Less kharchiCash advance on Wednesday−₹1,000
Net weekly payout₹2,850

Illustrative figures. Overtime appears as a separate line. True Site Sync's default overtime rate is 1.5 × the hourly rate (day rate ÷ 8), and you should set it to your contract or state-notified rate. Daily rates must be at least the minimum wage notified for that skill in your state.

Labour Codes: which registers you need in 2026

All four Labour Codes took effect on 21 November 2025, and the final Central Rules were notified in May 2026 (BDO summary). The central forms include an Attendance Register cum Muster Roll (Form IX) and a Register of Wages, Overtime, Advances, Fines and Deductions (Form IV).

Most construction sites follow state rules, which differ in forms and timelines, so check your state's notified rules. True Site Sync's monthly muster and payroll records hold the data these registers ask for: days present, overtime, advances, deductions and wages paid. Export them as PDF or Excel for inspections. For the background, read our labour attendance and wage management guide.

Paper, free hajiri apps or a construction app?

Paper muster rollFree hajiri appsTrue Site Sync
Attendance on a phoneNoYesYes, offline
Half day, OT, kharchiNotes in the marginVaries by appBuilt in
Gangs and labour contractorsSeparate bookVaries by appLinked to the gang leader
Labour cost per projectNoUsually notAutomatic
Also runs billing, material, DPRNoNoYes

Free attendance-only apps such as HajariBook are a fair choice if attendance is all you need. If you also want wages tied to project cost, billing and material, a construction platform saves the double entry.

Site par hajiri kaise lagaye?

Supervisor app kholta hai, project chunta hai, aur har mazdoor ya mistri ke aage P (present), H (half day) ya overtime ghante bharta hai. Network na ho to bhi entry phone me save ho jati hai aur signal aate hi office tak pahunch jati hai. Hafte ke end me Bulk Pay se sabki kharchi kaat kar payment ho jata hai.

Frequently asked questions

Which is the best labour attendance app for a construction site?

The one your supervisors will use every day. It should work without network, take seconds per worker, handle half days, overtime and advances, and feed wages and project cost without Excel. Test it free on your worst-signal site before deciding.

Can construction attendance be marked without internet?

Yes, with an offline-first app. In True Site Sync, attendance saves on the phone instantly and syncs to the office when the phone gets a signal.

Is a digital muster roll valid under the Labour Codes?

The Labour Codes in force since 21 November 2025 prescribe an attendance register cum muster roll and a wages register, and are widely reported to allow electronic registers. Check your state's notified rules, and keep exports ready for inspection.

How do I deduct kharchi (advance) from weekly wages?

Record each advance against the worker when you give it. At payout, the advance is subtracted from the wages earned. True Site Sync's Bulk Pay does this automatically for each selected worker.

Can I link workers to a thekedar or gang leader?

Yes. Each worker can be linked to their contractor or gang leader (mukadam), or marked as direct, so gang settlements and labour contractor bills come from the same attendance.

How do I stop proxy attendance?

Mark attendance on site, on the day, rather than writing it up later. For staff, True Site Sync records punch in and out with GPS location and a photo.

Site par hajiri lagane wala app kaun sa hai?

True Site Sync me supervisor phone par har mazdoor ki hajiri (P, half day, OT) lagata hai, bina network ke bhi. Kharchi aur katauti record hoti hai aur hafte ka payment ek baar me ho jata hai.

Start with one site this week

Run the app next to your muster roll for one week and compare the totals.

Start free 6-day trial

Large contract workforce? Book a demo.