Construction weather check: pour, plaster or wait?

Site engineers check the weather before every pour. Enter today's forecast from the IMD or your weather app, pick the activity, and get a go / caution / postpone call with the precautions to take, then record it in the DPR for any delay claim.

âś“ 6 site activitiesâś“ Rain, heat and windâś“ Free, no login

By the True Site Sync team · Last updated 28 October 2026

Site weather checker

Take the forecast from the IMD (or its Mausam app) or your phone's weather app.

These are general site rules of thumb. Your specification, the material manufacturer's data sheet, IS 7861 (extreme weather concreting) and your crane's rated wind limit come first.

Weather rules by activity

ActivityRainHeatCold / wind
ConcretingDon't pour unprotected in rain; keep tarpaulins readyHot weather measures: pour early or late, cool the water, cure at onceBelow about 5°C, protect and insulate (IS 7861 Part 2)
External plasterPostpone if rain is likely before it setsDamp the wall first and cure; avoid direct afternoon sunWind dries the surface fast, so cure more
WaterproofingSurface must be dry; no rain until it curesFollow the product's temperature rangeFollow the product's data sheet
External paintingDry surface; no rain until touch-dryAvoid hot afternoon surfacesFollow the data sheet
ExcavationPlan dewatering; heavy rain raises collapse riskWater and rest breaks for workers—
Crane lift / heightStop in lightning and stormsHeat breaks for workersStop above the crane's rated wind limit

Record weather for extension-of-time claims

Rain and heat stoppages are common grounds for extending the completion date. Without daily records, a claim is your word against the client's. Log the weather and lost hours in the DPR every day. On CPWD-style contracts, also enter them in the hindrance register. Check your exposure with the LD calculator.

In True Site Sync, each daily progress report has a weather field that prints on the DPR PDF. Progress entries can be marked Clear, Cloudy, Light Rain, Heavy Rain, Hot or Windy, and schedule changes can carry "Rain / Weather" as the reason. Your delay record builds itself.

Seasonal planning by region

Frequently asked questions

Can concrete be poured in the rain?

Not unprotected. Rain washes out cement and raises the water-cement ratio. Postpone, or cover the whole pour area with sheets, and stop at a planned construction joint if heavy rain starts.

What is hot weather concreting?

Precautions when high temperatures make concrete lose workability and crack: pour in the early morning or evening, cool the mixing water, shade the aggregates and start curing immediately. IS 7861 Part 1 covers the recommended practice.

At what wind speed should crane lifts stop?

Stop when wind exceeds the crane's rated limit in the manufacturer's manual. It varies by crane and load, and large panels catch wind earlier.

Why record weather in the DPR?

Daily weather and lost-hour records are the evidence for extension-of-time claims and against liquidated damages. Without them, rain days are hard to prove.

Where can I get a reliable weather forecast in India?

The India Meteorological Department (IMD) publishes forecasts and warnings on mausam.imd.gov.in and in its Mausam app.

Barish me concrete dal sakte hain?

Bina dhake nahi. Barish se cement beh jata hai aur paani zyada ho jata hai. Pour aage badhaiye ya poori jagah tarpaulin se dhakiye, aur tez barish me construction joint par rokiye.

Weather in every DPR, automatically

Daily progress with weather and delay reasons, ready for your extension-of-time claim.