🏗️ Plant & Machinery

Plant and machinery software that turns your fleet into numbers you can act on

From batching plants to rollers, track deployment, running hours, maintenance and cost across all your sites — so plant earns its keep instead of sitting idle or breaking down unplanned.

✓ Offline on site✓ Built for Indian sitesFrom ₹2,400/yr

A fleet you can't measure is a fleet you can't manage

Plant is capital on wheels. A batching plant, a boom placer, a fleet of tippers — each represents lakhs of rupees that either earns through utilisation or bleeds through idle time and unplanned breakdowns. Yet on most sites, the only "plant management" is an operator's memory and a diesel register, and the only sign a machine is under-utilised is a hire bill that feels too high.

The two silent killers are idle time and reactive maintenance. A machine that isn't deployed still depreciates, still needs an operator, still costs interest on the capital. And a machine run to failure costs far more in downtime and emergency repair than one serviced on schedule. Both are invisible without data — and both are entirely preventable with it.

The core idea: measure utilisation and service every machine on schedule, and your fleet stops being a cost centre you can't see into.

See it in action

Here's a plant dashboard in True Site Sync — utilisation and maintenance status across the whole fleet.

True Site Sync — Plant Dashboard · Fleet of 14
Utilisation
68%
Service due
3
Breakdown days
5
Idle days (wk)
11
PlantSiteHrs (mo)Next serviceCost/hrStatus
Batching plant 30m³Riverside4122,140 hrs₹—Running
Boom placerIdle0——Idle 6d
Tandem rollerHighway NH-6188Overdue₹—Service now

Illustrative plant dashboard — utilisation, service schedule and cost tracked across the fleet.

▶
Product walkthrough (demo video coming soon)

How plant management works

Build your fleet register

Add each plant item with capacity, ownership, hire rate and service intervals.

Deploy to sites

Assign plant to projects and log transfers, so you always know where every machine is.

Log hours & maintenance

Record running hours and service events; the system schedules the next service automatically.

Review utilisation & cost

See utilisation, idle time and cost per hour by machine and by project, and rebalance the fleet.

What plant software gives you

📊

Utilisation

Running hours vs available hours, per machine and per site, so idle capital stands out.

🛠️

Preventive maintenance

Service schedules by hours or date, with reminders before failure — not after.

💵

Hire vs owned

Compare the real cost of owning against hiring, machine by machine.

🚚

Deployment

Assign and transfer plant between projects with a full movement history.

⛽

Fuel & consumables

Track diesel and consumables against hours to spot inefficient machines.

📈

Cost per hour

True operating cost per hour, so you know what each machine really costs to run.

Who uses it

Infra contractor

Heavy fleet on long jobs

Manages pavers, rollers and crushers across a highway package, keeping every machine serviced on schedule to avoid a breakdown that stops the whole laying train.

RMC / batching operator

Plant uptime is revenue

Tracks batching-plant hours and preventive maintenance so downtime — and lost dispatch — is minimised.

Owner comparing buy vs hire

Capital decisions with data

Uses real utilisation and cost-per-hour figures to decide whether the next machine should be bought or hired.

Plant software vs. operator memory

TaskManualTrue Site Sync
Fleet utilisationUnknownMeasured
Preventive maintenanceRun to failureOn schedule
Cost per hourGuessworkCalculated
Buy vs hire decisionGut feelData-backed
Where each machine isPhone callsLive
Works offline on site—Yes

Plant, equipment and the whole site

Plant and machinery is one view of the same asset picture as equipment management and tool tracking, and its costs flow into your cash flow and construction ERP. Explore the full inventory & equipment management approach to see how stores, tools and plant come together.

Plant and machinery software — FAQs

What is plant and machinery software?

It is software that manages construction plant — batching plants, rollers, pavers, cranes and more — tracking deployment, running hours, maintenance, fuel and cost per hour across all your sites, so your fleet is utilised and serviced on schedule.

Does it handle preventive maintenance?

Yes. You set service intervals by running hours or date, and the software schedules the next service and reminds you before it is due, so machines are maintained on schedule rather than run to failure.

Can it compare owned vs hired plant?

Yes. Each machine records its ownership type and hire rate, and the software shows utilisation and cost per hour, so you can make buy-vs-hire decisions with real data.

Does it show plant utilisation?

Yes. Running hours are compared against available hours per machine and per project, so idle plant and under-utilised capital are immediately visible.

Does it work offline on site?

Yes. True Site Sync is offline-first, so hours and maintenance can be logged with no signal and sync when you reconnect.

How much does it cost?

True Site Sync starts at ₹2,400/year for the Solo plan with a free 6-day trial of the full platform, plant management included.

★ ★ A fleet that earns its keep
“

Before, a roller would break down mid-project and we'd lose two days waiting for parts. Now every machine is on a service schedule and we see it coming. Utilisation is up and unplanned breakdowns are down — the fleet finally pays for itself.

VS
Vikram Singh
Infrastructure Contractor
★★★★★

Make your fleet earn its keep

Start free — measure and maintain every machine.

Start free 6-day trial